Skip to content
Home
About Us
About Us
Our Mission
Company Profile
President’s Message
Policies
Code of Ethics
Employee Login
Office 365 Login
Yammer
Business Portal Login
Remote Desktop Login
Strengths
Projects
All Projects
Ongoing Projects
Completed Projects
Partners
Clients
Certificates
Contact
Menu
Home
About Us
About Us
Our Mission
Company Profile
President’s Message
Policies
Code of Ethics
Employee Login
Office 365 Login
Yammer
Business Portal Login
Remote Desktop Login
Strengths
Projects
All Projects
Ongoing Projects
Completed Projects
Partners
Clients
Certificates
Contact
Projects
Filter Projects:
All Sectors
Buildings
Industrial
Oil & Gas
Roads & Infrastructure
Special Projects
All Projects
Ongoing Projects
Completed Projects
Construction of Mega Reservoir PRPS 2 Umm Slal
Duration: 36 months
97% Completed
Design, build, operate and Maintain of Musaimeer Pumping Station and Outfall Project
Duration: 48 months
Engineering, Procurement and Construction (EPC/ Turnkey) for Military Medical Complex at Tarek Bin Zeyad Camp in Sailiyah (South of Doha) [AA-103-01]
Duration: 36 months
70% Completed
Design and Build (DB) Contract for FIFA Readiness Project 3A (FRP 3A) for Surface and Ground Water Network at Al Thumama Scheme C851/3A
Duration: 30 months
98% Completed
Construction of FPS-Phase 3 for Doha South Areas- C850/2
Duration: 24 months
90% Completed
Roads & Infrastructure in Umm Slal Mohammed PH2 – PKG1
Duration: 48 months
55% Completed
Lusail Residential Tower for Commercial Bank PSQC Main Works Package
Duration: 17 months
98% Completed
North Field North Onshore Project of QatarEnergy LNG
Duration: 48 months
60% Completed
Construction Of Le Boulevard, Al Sadd Street
Duration: 24 months
99% Completed
North Field South Onshore Project of QatarEnergy LNG
44 months